Colruyt
Medium voltage installation
Colruyt
Medium voltage installation
In 2013, Colruyt Group started the construction of a new distribution center in Ollignies (Hainaut). This distribution center has a surface of about 30 000 m².
Ceratec supplied the complete installation of medium voltage. The installation amounts 5.4 Megawatt with 4 big cabins of medium voltage and a total of 18 MS cells placed in a loop to be able to give tension on both sides.